Interactive Example
The Contribution Loop
Six steps from a need raised in the weekly session to a component every designer can use.
The Whole Loop
Let the loop play, or press a step to go to it. The solid line is the usual path. The dashed lines are the other paths.
Swipe the map sideways to see every step.
Raise It
Weekly Session: What the Library Is Missing
Designers add topics and vote. The topic with the most votes goes forward.
- Most votes7 votesData table with bulk actions3 products, 9 screensRaised by two designers
- 3 votesStatus timeline2 productsRaised by one designer
- 4 votesFilter bar4 productsRaised by three designers
What to noticeThe people who will use the system decide what goes forward, in the open, every week.
Check the Library First
data table
- TableRows and columns, no selection
- ListA single column of rows
Nothing with bulk actions.
What to noticeSearching first keeps the library from growing duplicates. Sometimes the answer is already there.
Point to What Exists
Sometimes the answer is already in the library, and nobody knew. The fix is guidance, not a new component.
What to noticeA missing piece of guidance looks exactly like a missing component from the outside.
Build It on a Branch
Branch: data-table-bulk-actions
- DefaultNo rows selected
- SelectedAction bar appears
- EmptyA message and a way to add rows
- Auto layout
- Main component
- Library tokens only
What to noticeBuilt the way the library is built, so it does not start drifting the day it is merged.
Review It Together
- Core teamCan the action bar reuse our existing toolbar?
- MeYes. Swapped it in, and the bar now inherits its spacing.
- Core teamApproved once the empty state has guidance.
What to noticeThe owners review it. Contribution without their review is how one-off libraries start.
Merge It and Write It Down
Merged into the Core library
Data Table With Bulk Actions
Use it when people act on many rows at once.
Do not use it for a list a person reads but never acts on.
What to noticeThe component ships with when to use it and when not to. That is the part the library never had.
Swap It In
Closed: Data table with bulk actions
- Local copies replaced this sprint
- 4 of 9
- Left, scheduled in planned work
- 5
What to noticeDesigners see their own request closed. That is the moment the rhythm earns trust.